Eyrix — Blog
Blog
Constraint-based planning — asset-constrained scheduling and manufacturing & supply.
-
Aircraft utilisation for regional & ACMI operators: 5 gaps that quietly erode it
Five concrete gaps that drag down aircraft utilisation at small operators, and how to spot them before they show up in the block-hour numbers.
-
Block-hour charter agreements: how ACMI billing actually works
A block-hour charter agreement bills for flight hours, not flights — and that changes what actually needs to be planned for. What block-hour billing means in practice.
-
Charter and ACMI flight scheduling: why it's harder than a fixed timetable
Charter and ACMI operators re-plan constantly against a fleet that never sits still. Why ad-hoc scheduling is harder than a scheduled airline's timetable, and what a solver changes.
-
Crew scheduling software: what a spreadsheet roster really costs
Why a manual crew roster in a spreadsheet quietly erodes utilisation and compliance at small airlines — and what crew scheduling software changes.
-
Crew type-ratings and rostering: matching the right crew to the right tail
Type-ratings, recency and currency decide who may operate which aircraft. Why qualification is the constraint that quietly shrinks a roster, and what crew rostering software checks.
-
EASA FTL in practice: the rest and duty limits your roster has to respect
A plain-language map of the EASA flight time limitations a crew roster has to respect — flight duty period, minimum rest, WOCL and cumulative limits — and why a spreadsheet can't check them.
-
FEFO and batch traceability: build it into the plan, not after the fact
In regulated production, traceability is a condition of being allowed to produce. Why FEFO and lot origin belong in the planning model itself — not reconstructed when the auditor asks.
-
Finite capacity scheduling: why your ERP plans against capacity you don't have
Classic MRP backschedules as if your lines have infinite capacity. What finite capacity scheduling checks instead — and why the overload only shows up on the floor if you don't.
-
The make-or-buy decision in production planning: stop deciding by gut feel
The make-or-buy decision is usually made on experience, not a worked comparison. Why the real question is which split is feasible and cheapest — and how to answer it.
-
Tail assignment planning: building aircraft rotations that actually close
Tail assignment is more than picking an available aircraft — the rotation has to close in space and time. Where manual tail assignment breaks, and what an engine checks.